阶段空场嗣后充填法凿岩硐室矿柱对顶板稳定性的影响
向伟华, 路燕泽, 刘志义, 王社光, 王立杰, 甘德清, 陈彦亭, 杨志强
Influence of Pillars in Drifting Chamber on Roof Stability During Sublevel Open Stoping with Backfill
XIANG Weihua, LU Yanze, LIU Zhiyi, WANG Sheguang, WANG Lijie, GAN Deqing, CHEN Yanting, YANG Zhiqiang
矿冶工程 . 2025, (3): 69 -76 .  DOI: 10.3969/j.issn.0253-6099.2025.03.011