高阶段矿房采场底部结构优化与出矿工艺改进
黄毅, 戴兴国,, 白瑛,, 汪令辉,
Optimization of Trench Structure and Ore-drawing Technology Improvement for High-stage Mining Room
HUANG Yi, DAI Xing-guo,, BAI Ying,, WANG Ling-hui
矿冶工程 . 2013, (5): 21 -24 .  DOI: 10.3969/j.issn.0253-6099.2013.05.005